H1: Proper ROTARY VALVE Installation Procedures for Optimal Performance
Meta Description: Follow our engineer-approved ROTARY VALVE installation checklist to ensure leak-free operation and extended service life. Compliant with ANSI/ASME B16.34 standards.
Pre-Installation Checks
Verify ROTARY VALVE markings against P&ID diagrams
Clean internal surfaces with non-abrasive solvents
Confirm flange rating matches pipeline specs (150#/300#)
Installation Protocol
Alignment: Use laser tools to ensure <0.1mm shaft deviation
Bolting: Tighten diagonally to 30 Nm torque in 3 stages
Testing: Conduct 1.5×MAWP hydrostatic test for 30 mins
Post-Installation
Run 8-hour operation at 50% capacity
Check bearing temperature (<65°C) and vibration (<4.5mm/s)